Mining Project

Client: Ammonia Nitrate – Explosives Manufacturer

Project Type: Retrofit

Project Final Location: Alberta

Project Highlights:

  • 3-week time constraint
  • Use of 3D design and modeling to reduce discrepancies

Heat Exchanger Replacement – Construction Scope of Work

Provide all labour, equipment, cranes, materials, and third-party services required to remove and replace existing process heat exchangers during a plant turnaround. Scope includes removal of two Boiler Feedwater Preheaters and two Nitric Acid Cooler Condensers, transport of the removed vessels to on-site storage, and installation of the new replacement units.

Work includes uprighting and handling of new vessels in the staging yard, transport to installation locations, structural steel and pipe support modifications, piping disconnection and reconnection, and large-diameter piping closure welds. The project also includes installation of new exchangers, reinstatement of associated piping and supports, required inspections, and welding in accordance with applicable codes and approvals.